PUBLIC HEALTH & MUNICIPAL ENGINEERING

a) PROFILE

The Superintending Engineer, Public Health Circle, Nellore is in charge of Plan, Investigation, Designs, and Execution of Water Supply, Sewerage, Storm Water Drainage, Traffic &Transportation Schemes in all the Municipalities in the SPSR Nellore, Prakasam, Tirupathi & Chittoor Districts except Municipal Corporation, Nellore & Tirupati besides the Technical support including O&M for the 21 ULBs in the above three districts.

After completion, the Water Supply and Sewerage Schemes are being handed over to the concerned Municipal Corporations and Municipalities for operation and maintenance.
Periodical inspection of all ULBs to guide and support for services maintained in 21 Urban Local Bodies of SPSR Nellore, Tirupati, Chittoor & Prasakam Districts.

PH & ME Department offers the following services to the ULBs :

• Approval of designs of Municipal works.
• Technical sanction to estimates up to Rs.200.00 Lakhs.
• Technical opinion to the Municipalities in finalization of tenders.
• Check measurement of works executed by the Municipal Engineers grade II & III.
• Periodical inspection of water supply and sewerage schemes maintained by Municipality.
• Approval of Bye-laws for water supply in Urban Local Bodies.

OUR VISION

1. To provide water supply as per CPHEEO norms (135LPCD) in all the ULBs
2. To provide scientific disposal and treatment of waste water in all the ULBs
3. To develop sustainable urban infrastructure to improve Municipal Service Delivery System

b)Organisation Structure:-

ORGANIZATION STRUCTURE

c)DEVELOPMENTAL ACTIVITIES IN SPSR NELLORE DISTRICT

I. HUDCO

COMPREHENSIVE NELLORE WATER SUPPLY IMPROVEMENT SCHEME WITH SANGAM ANICUT AS SOURCE WITH HUDCO LOAN ASSISTANCE

1. Estimate Cost :Rs. 556.77 Cr.
2. Admn.Sanction–G.O.Ms.No.272MA&UD Dt:18-12-15 for Rs.556.77 Cr.
3. Agency : M/s. Megha Engineering & Infrastructure Pvt., Ltd., JV with RVRPL
4. 99% of work completed and Water being supplied to the Existing tanks in Nellore City.

NELLORE UNDERGROUND DRAINAGE WITH HUDCO LOAN ASSISSTANCE

1. Estimate Cost :Rs. 580.85 Cr.
2. Admn. Sanction:GO.Ms.No.819MA&UD Dt:28-12-15 for Rs.580.85Cr.
3. Agency : M/s. Larsen & Toubro Ltd., Chennai
4. 85% of work completed.

WATER SUPPLY WORK PICTURES

II. AMRUT-1.0

Nellore – Storm Water Drainage Scheme under AMRUT 2016-20 :

Administratively sanctioned vide G.O. Ms. No. 211 MA&UD (UBS) Dept., Dt:24-05-2017 for Rs.82.02 Crores Agency : M/s. Megha Engineering & Infrastructure Pvt., Ltd., Hyderabad
Completed 20% of work and balance work is in progress

Kavali Water Supply Improvement Scheme under AMRUT:

Administratively sanctioned vide G.O.Ms.No.323 MA&UD(UBS) Dept., Dt: 29-08-2017 for Rs.59.30 Crores. Agency : M/s. KLSR Infratech Limited, Hyderabad
Completed 75% of work and balance work is in progress

Sewerage / Septage Management Scheme in Kavali Municipality under AMRUT:

Administratively sanctioned vide G.O. Ms. No.82 MA & UD (UBS) Department, Dt.03-03-2017 for Rs.29.11 Crores. Completed 70% of work and balance work is in progress

III. AMRUT-2.0

Buchireddypalem Nagarapanchayat – Providing Comprehensive water supply improvement scheme and Performance based O&M for 7years under AMRUT-2.0(Trench-I)

Administratively sanctioned vide GO M.S.No.12 MA&UD(UBS) Dept.,Dt:20.01.2023 Agency:M/s RR Constructions & Infrastructure India Pvt., Ltd.,Hyderabad Joint Venture with M/s. RPP Infra Projects Ltd., Erode(RRCIIPL-RPP JV)
Completed 13% of work and balance work is in progress

IV.ASIAN INSFRASTRUCTURE INVESTMENT BANK (AIIB)

Water supply distribution system in merged villages of Nellore Municipal Corporation with AIIB Funding :

1. Administrative Sanction vide G.O.Ms.No.260 MA&UD (UH) Department Dt:07-08-2018 for Rs.114.19 Crores.
2. Contracting Agency : M/s.Haricons Joint Venture with GPR Infra
3. Survey, Investigation, Designs is in finishing stage

V. CORPORATE SOCIAL RESPOBSIBILITY (CSR FUNDS)

Nellore Municipal Corporation – Providing Safe Drinking Water (Mineral Water) to 54 wards in Nellore Municipal Corporation from 6 Nos of Mother Plants of 10000 LPH Capacity each installed at 6 locations including Operation & Maintenance for a period of 57 Months (CSR Funds):

4. Administratively sanctioned vide G.O.Ms. No.949 MA&UD (Budget) Dept., Dt:05-10-2018 for Rs.24.90 Crores issued to the Municipal Corporation, Nellore
5. Agency : Sri. Sd. Amanulla JV with ACER Engineers Pvt., Ltd.
6. Completed 27% of work and balance work is in progress

d)CONTACT DETAILS

Sl.No Name Designation Phone Number
1 T.SAMPATH KUMAR(FAC) SUPERINTENDING ENGINEER 9849905737
2 K.VENKATESWARLU DEPUTY SUPERINTENDING ENGINEER 8074519002
3 A.GIRIDHAR EXECUTIVE ENGINEER 7893537278

e)E-Mails:

Superintending Engineer (PH) Email ID – seph[underscore]nlr[at]yahoo[dot]co[dot]in
Executive Engineer (PH) Email ID – eephmed[underscore]nlr[at]yahoo[dot]com

Superintending Engineer (PH) Office Address :

Superintending Engineer
Public Health Circle,
Mulapeta
NeelagiriSangam
Water Tank Compound
Nellore – 524003

Executive Engineer (PH) Office Address :

Executive Engineer
Public Health Special Division, Nellore
Magunta Layout
Nellore – 524003

State Website : www.appublichealth.gov.in