Close

A.P. Education & Welfare Infrastructure Development Corporation (APEWIDC)

a) DEPARTMENT PROFILE:

The Executive Engineer, A.P. Education & Welfare Infrastructure Development Corporation, Nellore earlier called as Social Welfare Engineering Wing had made out a significant role in execution of several number of civil works like Residential School Complexes, Hostel buildings in participation with S.C., S.T., & B.C. Welfare Departments for enlargement of literacy levels by providing Educational infrastructure facilities among the scholars belonging to weaker sections since 1986 besides Construction of Z.P. High Schools, Govt. High Schools and Collegiate Education works, Government Polytechnics etc., in building the “New Nation” after Independence.

Regarding Engineering-Setup, Managing Director, APEWIDC, Vijayawada is the administrative control authority & Chief Engineer is the Technical Head Authority and each District consists of one Division consisting of following Engineering Staff.

 

b) Organization Chart:

 

APEWIDC

c) Schemes / Activities / Action Plan:

Schemes:

  • School Education:

    • RMSA Phase – I

    • RMSA Phase- II

    • RMSA Phase- III

    • RMSA Phase – V

    • RMSA Model Schools

    • RMSA Girls Hostels Attached to Model School

  • Intermediate Education:

    • Construction of Jr.Colleges

    • Intermediate – NABARD works

    • Intermediate – Repairs & Maintenance

  • Collegiate Education:

    • RUSA Phase – I

    • RUSA Phase- II

    • Construction of Degree Colleges

    • Collegaite – Repairs & Maitenance

    • Collegiate – Stae Plan

  • Technical Education:

    • Technical Education – NABARD works

    • ITI Colleges

    • ITI Hostels

    • Polytechnic hostels

    • SC Sub Plan

  • Social Welfare:

    • Social Welfare – SC Sub Plan

    • Construction of Hostel Buildings [State plan / CSS]

    • Social Welfare – Integrated Welfare

    • Social Welfare – Ambedkar Bhavans

    • Social Welfare – Community Halls

    • Social Welfare – Study Circles

    • Social Welfare – Repairs & Maintenance

    • Social Welfare – Babu Jegjeevan Rao Bhavans

  • BC Welfare Department:

    • BC Bhavans

    • BC Residential Schools

    • BC Hostels

    • BC Repairs & Maintenance

    • BC Community Halls

    • Kapu Bhavans

    • CSS / State Plan.

  • Minority Welfare:

    • Shadhi Khanas

    • Construction of Churches and Masjids

    • Repairs & Maintenance

    • Minority Residential Schools

    • PMJVK

    • Compound Walls to Burial Grounds / Musjid’s.

  • Disabled Welfare – Disabled Department Works
  • Sainik Welfare – Construction of Sainik Welfare Works
  • Sainik Schools – Construction of Sainik Schools.
  • District CollectorateDistrict Collectorate Works
  • APSWREIS:

    • SC Sub Plan

    • Augmentation Works

    • APSWREIS Complexes

    • Compound Walls

    • Face lifting works

    • Repairs & Maintenance

    • NABARD works

    • HUDCO

  • APREIS:

    • Constructions works

    • Repairs & Maintenance works

  • Finance Department:

    • Finance Buildigns

    • Sub-Treasury Office Buildings

    • Repairs & Maintenance

  • Revenue Departments:

    • Tahsildar Offices

    • RDO Offices

    • Repairs & Maintenance

  • Grandhalaya Samastha:

    • Construction of Library

    • Repairs & Maitnenance of Library

  • SV Veterinary Univeristy:

    • SVVU University Grants

    • SVVU NABARD Works

  • Agriculture

    • Construction works

    • Repairs & Maintenance

    • NABARD Works

  • Animal Husbandry:

    • Construction works.

    • Repairs & Maintenance

    • NABARD Works.

  • Fisheries:

    • Construction Works

    • Repairs & Maintenance

    • NABARD

  • Sericulture Department:

    • Construction works

    • Repairs & Maintenance

  • Handloom & Tourism:

    • Construction works

    • Repairs & Maintenance

  • Sports & Tourism:

    • Kreeda Vikasa Kendram

    • Construction of Stadiums

    • Maintenance of Stadiums

    • Swimming Pools.

  • Chief Planning Office:

          • MP LADS

          • UCDP Funds

          • SDP Funds

          • SDF / DMF Funds

  • Women and Child Welfare: – ICDS Anganwadi
  • SC Corporation
  • HRD – Construction of Yuva Bhavans

 

 

Activities / Action Plan:

I. Higher Education:

Two (02) New works were sanctioned for Degree Colleges under RUSA Project-II with estimated cost of Rs. 140.00 Lakhs each, with a total out lay of Rs. 280.00 Lks. and the works are in progress. The works will be completed before December 2019.

II. Technical Education:

  1. Construction of Hostel building for S.C. Students was sanctioned with an estimated cost of Rs.100.00Lakhs and is in progress.
  2. New government Polytechnic College with hostel was sanctioned at Gudur under State Plan with an estimated cost of Rs. 1050.00 lakhs. Agreement Concluded on 08.03.2019 and the works are not started due to Election Code & latest instructions issued by the Government.

III. B.C. Welfare Department

a). B.C. Residential Schools (MJPAPBCRS)

The Government has sanctioned an amount of Rs.1916.50 Lakhs for three (03) B.C. Residential Schools under NABARD RIDF – XXII (Additional Accommodation) the works are in Progress will be completed before March 31st 2020.

b) B.C. Residential School (MJPAPBCRS) at Golagamudi

An amount of Rs.839.00 lakhs was sanctioned for providing Addl. Infrastructure facilities for dormitory and School Building and is at tender stage.

IV). District Tourism Dept. Works:

One work at “Development of Pottisriramulu Memorial Tourism Center at Juvvaladinne [V] of Bogolu [M] in SPSR Nellore District” with an Estimate Cost of Rs.300.00 Lakhs is in progress. The work will be completed before March 31st – 2020.

V. Sports Authorities:

Six (06) works are sanctioned by the District Sports Authorities, Nellore with total estimate cost of Rs. 660.00 Lakhs at Mogallapalem and A.C.S.R. Sports Complex, Nellore. The works are in progress. Out of which 2works completed, two works in progress, two works not started. Expenditure so far 114.13Lakhs, bills pending at PAO Rs, 71.67Lakhs. The work will be completed before April 31st 2020.

  • NTR Kreeda Vikasa Kendras: Eleven (11) Works are sanctioned with an estimate cost of Rs. 200.00 lakhs each with a total outlay of Rs. 2150.00 lakhs. Out of which, Five (05) works are in progress and remaining works are not started due to site problem. Expenditure done so far is Rs. 51.07Lakhs, and bills pending at PAO for Rs.200.00 Lakhs

VI.) Treasury and Accounts Department:

  • District Finance Office Building at Nellore was sanctioned with an estimated cost of Rs. 1375.00 lakhs and is at finishing stage will be completed before 28.02.2020.

VII) Minority Welfare Department:

  • The work Construction of A.P. Residential Schools for Minorities at Akkacheruvu -padu [V] of Nellore (Rural) Mandal was sanctioned with estimated cost of Rs. 1500.00 lakhs. The is under progress. The work will be completed before 30.12.2019.

VIII) Vikrama Simhapuri University:

    • The Government has sanctioned the following components to Vikrama Simhapuri University for Rs. 21.76 Cores, and are in progress Total Expenditure done so far Rs. 348.27 Lakhs.
Library Building Roof Level
Girls Hostel GF&FF Roof slab laid
Internal Roads Not required
Admn. Building Roof Level.
Boys Hostel To be taken up (Plan changed by University Authorities)
Compound wall Completed

IX.) District Collector Entrusted Works:

SDF Works:

Total 45 works (Repairs to Hostels) with a total outlay of Rs.382.50 lakhs are sanctioned. Out of which 11 works are completed, 5 works are at finishing’s Stage and 2 works are at below basement level. Remaining 13 works are at Tender Stage and the balance 14 works are not stated due to Election Code.

x) Other Works:

  1. Library Buildings:

    Eight (08) Library Buildings were sanctioned with total outlay of Rs.365.80 lakhs. Out of which 04 works are completed, 01 work is at finishing stage, 03 works are not started.

  2. District Mineral Foundation Trust works. (DMF):

    Eight (08) works were sanctioned with an estimate cost of Rs. 602.00 lakhs. Out of which 02 works are in Progress, 04 works are at Tender stage and 02 works are not started due to election code.

  3. R&R Programme:
  • R&R Center at Dhanalakshmipuram H/o Vaviletipadu of Nellore Rural Mandal for the Rehabilitation and Re-construction Villegers of Nelaturipalem Village for 171 Houses and other Required Amenities with an estimate cost of Rs.3470.00 lakhs and is in progress.
  • R&R Center at at Madarajugudur H/O Kakupalli Bit -II of Nellore Rural Mandal for the Rehabilitation and Re-construction of the Villagers of Nelaturu Main Village for 309 Houses and other Required Amenities with an estimate cost of Rs.6810.00 lakhs and is in progress.

d) Contacts:

Sl. No. Name Designation Phone Number
1 Sri T. Ananda Reddy, Executive Engineer, APEWIDC, Nellore. 9704701577
2 Sri. B. RadhaKrishnaiah Dy. Executive Engineer (I/c), APEWIDC, Gudur Sub-Division. 9704701570
3 Sri. A.Samson Dy. Executive Engineer (FAC), APEWIDC, Kavali Sub-Division. 9490125602
4 Sri K. Ravindra Babu Dy. Executive Engineer, APEWIDC, Nellore Sub-Division. 8008077055
5 Smt. S. Rajeswari, Superintendent, APEWIDC, Nellore. 9866204289
6 Sri. M. V. Subbarao, Head Draftsman, APEWIDC, Nellore. 9704701671
7 Sri. D. Kishore, Sr. Assistant, APEWIDC, Nellore. 8008102819

e) Email / Postal Address:

Email Id : ee_apewidc_nlr[at]ap[dot]gov[dot]in

ee[dot]apewidc[dot]nlr[at]gmail[dot]com

Address: O/o The Executive Engineer, APEWIDC, Nellore, D.No. 26-2-2341, Venkata Reddy Nagar, Near Kamakshamma Temple, Vedayapalem, Nellore – 524004, SPSR Nellore District.

f) Important Website links relating to the Department 

Andhra Pradesh Education & Welfare Infrastructure Development Corporation have Online e-procurement Tender Portal is http://www.apeprocurement.gov.in and Web site for Comprehensive Financial Management System portal of Finance Department for uploading the bills is https://cfms.ap.gov.in.