NEW & RENEWABLE ENERGY DEVELOPMENT CORPORATION OF A.P. LTD (NREDCAP)

a) PROFILE:

  • New & Renewable Energy Development Corporation of Andhra Pradesh (NREDCAP) is the State Nodal Agency for implementation of Renewable Programmes since 1984, Such as Solar Energy, Wind Energy & Biogas Programmes. The sole objectives of NEDCAP are to:
  • Generate electricity through renewable sources like wind and solar on decentralized manner
  • Conserve energy in rural areas
  •  Import & adopt viable technology & machinery in the areas of Non-conventional energy sources & ensures post installation service
  •  Impart training and to promote research and development in the field of Non-conventional energy sources

Our Vision:

To be a pioneer institute in the area of promotion of Non-conventional / Renewable energy projects with state-of-art technologies coupled with experts and technocrats to present highly competitive and efficient products to the consumer.

Our Mission:

The mission is to promote, develop, encourage, popularize and carry out consultancy, field research and experiments for implementation of Non-conventional / Renewable energy projects and gadgets sponsored by both State and Central Governments.

b) ORGANIZATION STRUCTURE:

organization structure

c) SCHEMES/ACTIVITIES/ACTION PLAN:

1. PM SURYAGHAR MUFT BIJLI YOJANA:

  • PM SURYAGHAR MUFT BIJLI YOJANA STRUCTUREPM SURYA GHAR MUFT BIJILI YOJANA was launched by Government of India on 13th Feb 2024
  • This Scheme is applicable for Residential Sector Only.
    The Scheme would be implemented through National Portal – http://pmsuryaghar.gov.in
  •  Target – Installation of Rooftop Solar Plants on One Crore House holds in the Country.
  • To Provide Free/Low-CostElectricitytoonecrorehouseholdsupto300 Units per month with Central Financial Assistance (CFA)

CENTRAL FINANIAL ASSISTANCE (CFA):

S.No Type of Residential Segment CFA
1 Up to 2KW  capacity with bench mark cost of Rs.50,000/KW Rs.30,000 per KW
2 Additional Capacity ranging between 2KW to 3KW with benchmark cost of Rs. 45,000/KW Rs.18,000 for additional KW
3 Additional Capacity beyond 3KW No additional CFA
4 Group Housing Societies/ Residential Welfare Associations (GHS/RWS) etc., for common facilities, including EV Charging, up to 500 KW(@3KWperHouse) with the upper limit being inclusive of individual rooftop plants installed by individual residents in the GHS/ RWA Rs.18,000 per KW

CENTRAL FINANCIAL ASSISTANCE – ELIGIBILITY:

  • Grid Connected Solar Power System tagged to a particular Residential power connection of the local DISCOM will only be eligible for the CFA.
  •  The CFA shall be irrespective of the size of the inverter installed.
  • Solar Modules used in the installation must be Domestically Manufactured Modules with Domestically Manufactured Cells.
  •  The CFA is eligible only for the newly installed systems. The shifted/ relocated to a new location, such systems shall not be eligible for the CFA.
  • The State/ UT Government may supplement the CFA provided by the Central Government with an additional subsidy.

APPLICATION PROCESS:

1. Register on National Portal for RTS and fill the application to generate unique application number.
2. Application fee shall be paid for setting up RTS System and obtain feasibility approval from DISCOM/ NREDCAP.
3. Selection of Vendor by applicant and installation of the System.
4. Submission of installation details for net meter.
5. Inspection of the System by NREDCAP officials.
6. Agreement between DISCOM and Applicant and Installation of Net Meter by DISCOM.
7. Generation of Commissioning Certificate
8. Submission of Bank details and required documents for release of CFA.

ROLE OF NREDCAP:

  •  Registration of Vendors.
  •  Feasibility of Solar Rooftop Installation
  •  Transforming Consumer Registrations in to Effective Installations.
  •  Inspection of the plant after installation
  •  Submission of Consumer/Plant Details.
  • Generation of Commissioning Certificate
  • Entering Work Completion details for CFA release
  •  Linking the Program with Bank finance
  •  Capacity Building and Awareness and Outreach
  • Appointment of Nodal Officers
  •  Liasoning with State Government and MNRE, Government of India.

2. SOLAR ON – GRID POWER PROJECTS:

As a part of “POWER FOR ALL” Government of A.P. has introduced Solar Rooftop for the Domestic, Govt. Offices, Schools and Colleges. Solar On Grid Systems can generate power when the utility power grid is available. They must connect to the grid to function, it can send excess power generated back to the grid when you are over producing, so you credit it for later use.

ORGANIZATION STRUCTURE OF GRID POWER PROJECTSComponents of Solar On – Grid System:

The System usually consists of Solar Panels, Grid Tie Inverter, Mounting Structure, Net Meter, DC/ AC Disconnects, Cables/ Wires and Earthing.

Basic Requirement:

Before choosing the On-Grid System, it is required to determine the total consumption in units, Contracted Load, Shadow free area.

Thumb Rule:

For installation of 1KWp Solar System required 10 Sq. Meters / 100 Sq. Feet area and it will generate 4 units/ day because we have approximately essential Sunshine Hours 4 to 5 hours per day.

Capacity of the System in KWp No.Of Units generated per day No. Of Units generated per month Area required
Sq. Feets Sq. Meters
1KWp 4 120 100 10
2KWp 8 240 200 20
3KWp 12 360 300 30

Specifications:

  •  Solar Panels should have the necessary certifications from Certifying agencies of MNRE or BIS/ IES.
     
  • Direction of the Solar Panels should be “South” with inclination of the Solar Panels (130– 150for AP) (If it is Fixed System).

Cost details of Grid Connected Solar Rooftop Systems:

Sl. No Capacity Total Price Per KWp
1 1KWp 76,490.00
2 2KWp 76,490.00
3 3KWp 76,490.00
4 4KWp 74,460.00
5 5KWp 72,400.00
6 6-10KWp 70,610.00
7 11-100KWp 67,080.00
8 101-500KWp 63,840.00

3. Solar Off – Grid Rooftop Programme:

An off-grid solar system is more popular and comes with a power backup. It works independently of the grid. Most home appliances such as Fans, TV, Cooler, AC, Water Pump etc. can work through this system. For instance, a 1 kW off-grid solar system is sufficientfor a 2-4 BHK house.

Organization structure – Grid Rooftop Programme

  • Solar Off-Grid Systems work independently without connecting to the grid but have batteries which can store the power generated by the system.
  •  The System usually consists of Solar Panels, battery, inverter, mounting structure etc.
  • The panels generate the Power during the day time (approximately5Hours–is called Essential Sunshine Hours)
  •  Off-Grid Solar Systems are independent, long-term and generate sustainable electricity power in rural and remote areas, when there is no grid.

Cost Details of Solar Off-Grid Rooftop System:

Sl. No Capacity Total System Cost
1 500Wp 57,110.48
2 1KWp 1,04,381.86
3 2KWp 2,01,371.33
4 3KWp 3,08,336.41
5 4KWp 3,87,529.26
6 5KWp 5,06,972.86
7 6KWp 5,83,810.74
8 7KWp 6,62,963.49
9 8KWp 8,20,347.85
10 9KWp 8,62,962.38
11 10 KWp 9,97,022.70

4. Solar Water Heating System :

  • NREDCAP has finalized the Rate contract prices for Solar Water Heating Systems through Expression of Interest from the suppliers / manufacturers who registered with NREDCAP at state level. The finalized rates will be communicated by our Head Office to all Districts for implementation.

Cost Details of Solar Water Heating System:

Sl.   No Capacity of the   System Total Price   (Rs.)
1 100   LPD System @ 60° C 21,000.00
2 200   LPD System @ 60° C 37,500.00
3 300   LPD System @ 60° C 56,640.00
4 500   LPD System @ 60° C 80.260.00
5 1000   LPD System @ 60° C 1,60,000.00

5. Solar Street Lighting System :

  • A Standalone Solar Photovoltaic Street Lighting System is an outdoor lighting unit used for illuminating a street or an open area.
  • The Solar Street Lighting System consists of SPV Module, aluminaire, Storage Battery, control electronics, interconnecting wires/ cables, module mounting pole including hardware and battery box.
  • The luminaire is mounted on the pole at a suitable angle to maximize illumination on the ground. The PV Module is placed at the top of the pole at the angle facing south so that it receives solar radiation through put the day, without any shadow falling on it.
  •  Electricity generated by the PV Module charges the battery during the day time which power the luminaire from dusk to dawn. The System lights at dusk and switches off at dawn automatically.

COST DETAILS:

Sl.No Description Location Type Sale Price Inclusive of GST (Rs.)
1 18WLEDSolarSt. Light Non Remote 24985.84
Remote 26175.65
2 36WLEDSolarSt.Light (2x18W) Non Remote 43427.76
Remote 46223.8
3 20W LED based Solar Street Lighting System along with Display Board Non Remote 29274.56
Remote 30320.08
4 40W (2 Nos x 20W) LED based Solar Street Lighting System along with Display Board Non Remote 48781.87
Remote 49971.67
5 60W LED Solar St. Light 77932.02
6 120W LED Solar St. Light(2x60W) 125462.45
7 160W LED Solar St. Light(4x40W) 198648.83
8 9W LED Solar Path way Lightining System 16538.24
9 15W LED   Solar Blinker 20226.63
10 Sim Based 3600 Solar Camera 41643.06
11 2W Solar Lantern 1755.26

Solar LED Street Light organization structure

  • NREDCAP also provide Solar Home Lighting Systems, Solar Vendor Cart Lights, LED Street Lights.

6. New National Biogas Organic & Manure Programme :

A Boarder of Definition of Biogas includes all Organic Matterie., Municipal Solid Waste, Agri Residues, Animal Dung, Poultry Droppings etc.

Organization structure- Biogas Plant

CENTRAL FINANCIAL ASSISTANCE (CFA):

Sl. No Particulars of   CFA Biogas   Plants under Biogas Program ranging from size 1 to 25 cubic meter biogas per   day
CFA Applicable 1 Cum 2-4 Cum 5-7 Cum 8-13 Cum 14-19 Cum 20-25 Cum
1 SC/ST Category 17,000 22,000 29,250 34,500 63,250 70,400
2 General Category 9,800 14,350 22,750 23,000 37,950 52,800

TARGET FOR THE YEAR 2024-25

Sl. No District CATEGORY TARGET–2024-25
Gen SC ST Total BG Plants OOT’s CCM’s
1 NELLORE 45 10 5 60 2 0

7. Solar Pumping Programme:

As a part of “POWER FOR ALL” Government of A.P. has introduced Solar SPV Pumpsets to the Agriculture Consumer’s along with DISCOM, DWMA and Agriculture Departments.

Organization Structure-Solar PV Pump

Cost Particulars of Solar PV Pump sets:

Sl. No Capacity Total
1 3HP-AC ModelSurfaceMounted 188526
2 3HP-AC  Model Submersible 197095
3 5HP-AC ModelSurfaceMounted 267533
4 5HP-AC   Model Submersible 275297
5 7.5HP-AC ModelSurfaceMounted 389536
6 7.5HP-AC Model Submersible 358311

8. E–MOBILITY:

Establishment of Charging and Swapping Infrastructure for all Electric Vehicles:

Organization Structure E–MOBILITY

NREDCAP has proposed to establish fast charging stations at every 25Kms on National / State Highways and every 3×3 Km grid with in the cities so far NREDCAP has identified 150 Public and Private Locations like IOCL petrol pump stations, APSPDCL 33/11 KV substations, APSRTC Depos, Restaurants etc., for establishment of Electric Charging infrastructure to charge E-Vehicles (2-Wheelers, 3- Wheelers, 4-wheelers).

D) Contacts:

Sl.No Name   of the Employee Designation Contact   Number
1 Sri   V. Krishna Reddy Project   Director, Nellore 9849853818

E) Email/Postal Address:

H.No. 26-11-227/1, Beside DTTC Courier, Padarupalli Road, Mini Bypass, Nellore-524004.